The Letter of Reliance is now included in the Local Considerations Export for sites, along with the HRP and PI Surveys, the SSRP, and the Institutional Profile.
Category Archives: August 2022
Updated Feature: PI checklist step has been renamed
The “Complete PI Survey” step on the PI’s Getting Started checklist has been renamed to “Complete/Attest to PI Survey”.
Updated Feature: PI Survey Edit/Attestation Dates available on PI Survey PDF Export
The PDF Export of the PI Survey contains a table displaying any dates the PI Survey was edited and the initial attestation and any subsequent re-attestations that were completed.
Updated Feature: The Status Summary tab now shows PI Attestation date
The local considerations section on the Status Summary tab now shows when the PI Survey is “Awaiting PI Attestation” and the PI Attested date.
Updated Feature: PI Survey Attestation Date available on Status Summary tab Export
The Status Summary Tab Export now includes the most recent PI Survey attestation date. All PI Surveys that were completed before Investigator Attestation was required will show the PI Survey completed date as the Investigator Attestation date.