When a coordinator completes the PI Survey and clicks “Send to PI”, a notification is sent to the Investigator requesting review and Attestation to the PI Survey. This email is sent the first-time a coordinator completes PI survey.
Category Archives: Study PI
New Feature: PIs can click a button to attest to the PI Survey
Investigators are no longer required to add a signature to attest to the PI Survey. Investigator Attestation is captured the first time the Investigator completes and submits the PI Survey. If edits were made, Investigator attestation is captured when the Investigator clicks the “Attest to PI Survey” and “Edit and Attest” buttons.
New Feature: Investigators are notified when edits are made to the PI Survey
Investigator will receive an email notification when Relying HRPPs and Coordinators make edits to the PI Survey. Investigator must attest every time edits are made to the PI Survey.
New Feature: Relying HRPPs and Investigator are no longer required to verify study team access
The Getting Started Checklist for Relying HRPPs and Investigator no longer requires verifying study team access. If a Study Manager adds a site Coordinator when initially adding the site to a study, that Coordinator now gets access to IREx when the Relying HRPP registers for the study in IREx, rather than waiting for the Relying HRPP or Investigator to verify their access. Relying HRPPs and Investigator have the optional step to “Add/ Edit Study Team Access” as needed.
Updated Feature: PI checklist step has been renamed
The “Complete PI Survey” step on the PI’s Getting Started checklist has been renamed to “Complete/Attest to PI Survey”.
Updated Feature: Protocol document not included in the sort filter
On both the Study-wide IRB Approvals and the Approval History tab, the protocol is now pinned at the top of documents and not included if sorted. This is to help make it easier for users to find the protocol after sorting.
New Feature: SIRBs and Study Managers can Add Site Coordinator Access to IREx
IREx now allows sIRBs and Study Managers to give coordinator access at sites that have registered for their study. For convenience, sIRBS and Study Managers can give coordinators access from:
- the Approval History tab, select the site from the View As dropdown and select +Add Site Coordinator Access from the site menu.
- the Participating Personnel dialog, select the +Grant Site Coordinator Access.
View this Add Site Coordinator Access Quick Guide for reference.
New Feature: SIRBs and Study Managers can give a new Site PI Access to IREx when adding a Site Amendment
If a site PI is changed after the site receives initial approval, sIRBs and Study Managers can give the new PI study access via a site amendment. This avoids asking the relying HRPP to login to IREx and add the new PI.
View this Add Site Amendment Quick Guide for reference.
New Feature: An email notification is sent to the PI when a new coordinator is added at their site.
When a sIRB or Study Manager gives a site coordinator access to their study, an email notification, “New Coordinator Added” is sent to the PI. The email lists the study title, the sIRB Liaison or Study Manager who added the coordinator, site name, new coordinator name and email, and link to the study.
New Feature: Reorganized Site Approvals on the NEW ‘Approval History’ tab
Relying Sites can now access ALL approval documents from a single tab. IREx has combined the Study-wide and Site-specific IRB Approvals tabs for relying sites into a single ‘Approval History’ tab to simplify navigation. On the Approval History tab, the current approval is displayed first followed by all past approvals in descending order. The Reviewing IRB and Study Manager can use the Approval History tab to view approvals shared with a specific site.