Category Archives: Study PI

Updated Feature: One PI Survey per FWA engaged in a Combo Site

PIs will now complete a separate PI survey for each FWA in a Combo Site, with the option to copy their PI survey responses from the other site in the study. A separate PI survey allows for more accurate capture of the conduct of the study for each site in a combo. As with all sites on a study, the HRPP of a site in a Combo validates the PI survey responses

New Feature: sIRBs and SMs Can Close Sites in IREx

sIRBs and Study Managers can now close sites on studies. A reason or reasons for closure, date of closure, and determination letter are required to post a site closure. Closing a site sends a notification to the site’s HRPP and study team members and archives all past approvals so that no documents can be downloaded. Participating sites continue to have access to site closure documentation for 30 days after a site closure is submitted, after which the site cannot access the study in IREx. A listing of closed sites is available to sIRBs and Study managers on the Status Summary tab. For further information, see the Site Closure Quick Guide.

New Feature: sIRB Can Close Studies on IREx

sIRBs can now close studies that are complete on IREx by uploading the reason and date of closure, as well as the IRB determination letter. Closing a study notifies sites that the study has ended. The study remains accessible to all registered sites after a closure is posted, and all past approvals become read-only. A record of sites’ reliance details and a history of sIRB site approvals are still available in all IRB exports for metrics. For instructions on how to close a study, see our Quick Guide.

Here is what you will see for a closed study:

  • Study page is grayed out with a Study Closed header at the top
  • Status Summary Tab shows as Closed in Approval column
  • IRB Dashboards show that a study has been closed
  • Versions box shows that a study has been closed
  • Exports show closed studies with date of closure